Station 57

Station 57 Rendering

Station 57 – Lake Symington

Address: 14500 NW Coho Run, Bremerton, WA 98312
Serving the Lake Symington, Lake Tahuya, Crosby, Holly and surrounding Seabeck communities
Architect: Rice Fergus Miller
Contractor: Berschauer Group Inc.
Construction period: December 2022 – December 2023
Size: 10,993 sqft
Design: 4-Apparatus Bay, 5-Dorm facility

Project Status

Progress as of October 7, 2022

Site:

  • Preliminary site preparation began by contracting with Puget Sound Energy to have two (2) power poles that were located on the property relocated into the County Right-of-Way.  PSE completed this work and had their lines and switch gear installed on the new poles.  Lumen (CenturyLink) has installed their lines on the new poles and is currently working on making final connections.  Once the services have been switched over, the old poles will be removed.

Building:

  • The Fire Station 57 project has gone out to bid.  Bids will be collected on October 26, 2022.  The “Notice to Proceed” is anticipated to be issued on or around December 5, 2022.